textual image stating 'Department of Health, Victoria, Australia'

4. The design development report

Report format requirements

The complete feasibility study report format requirements are detailed in the consultant’s checklist, which is supplied in a word format and is to be included in the feasibility study report.

Quality assurance

The report is to be reviewed and quality assurance checked by the project manager prior to submission. The document is to be completed, certified and signed by the principal consultant and endorsed and signed by the consultant project manager.